Get In Touch
711 E. Turtle Point Dr. Ivins, UT. 84738,
[email protected]
Ph: +1.208.716.3077

Date Built: 2007
Unit details: Two Frances turbines mounted on single synchronous generator.
Additional details: Constructed in the rain forest of Central America. Penstock on piers. Utilized unskilled labor.

  • Size

    3.4 MW

  • Nearest Town

    Punta Gorda, Belize

  • Head

    120 ft

  • Flow

    250 CFS; 125 CFS

  • Penstock diameter

    72″

  • Penstock length

    550′

Leave a Reply

Your email address will not be published. Required fields are marked *

We use cookies to give you the best experience. Cookie Policy